Planning Poker & sprint capacity calculator

Overcommitting a sprint usually starts with ignoring holidays, ceremony overhead and review load. Enter your squad roster, PTO days, ceremony hours, focus factor and recent sprint velocities to calculate a realistic story-point commitment band. Then switch to the Consensus Analyzer to test Fibonacci, Modified Fibonacci, Powers-of-2 or T-shirt card spreads and spot when a backlog item needs splitting.

Net productive hours

235.2h

95% of zero-PTO squad baseline

Recommended commitment

31 pts

Scaled from 33 avg velocity

Safe floor / Stretch ceiling

26 - 35 pts

85% high-confidence to 110% stretch

Squad roster (5)

51.8h
46.6h
51.8h
33.2h
51.8h
Backend: 51.8hFull-stack: 79.8hFrontend: 51.8hQA: 51.8h

Squad roster and velocity settings stay in your browser local storage and are never sent to a server.

Preguntas frecuentes

How is net sprint capacity calculated?

For each team member, we subtract PTO and holiday days from the sprint length, multiply working days by daily hours and their availability percentage, subtract sprint ceremony hours (planning, daily standups, review and retrospective), and apply your focus factor (typically 65% to 75%) to account for code reviews, Slack, support and unplanned interrupts.

How does historical velocity turn hours into a story-point target?

Story points measure relative effort rather than raw hours, so the cleanest way to adjust for PTO is scaling your average historical velocity by this sprint's capacity ratio (net available person-days divided by a full-attendance baseline). We report a safe floor (85%), target (100%) and stretch ceiling (110%).

Why use Fibonacci numbers instead of 1-10 in Planning Poker?

Uncertainty grows faster than task size. The widening gaps in 1, 2, 3, 5, 8, 13, 21 stop a team wasting five minutes arguing between a 6 and a 7, and make a jump from 5 to 13 an unmistakable signal that hidden complexity or scope needs discussion.

When should a team split a story instead of accepting the estimate?

Most agile teams treat 13 points as a warning and 20 or 21 points as too large to fit reliably inside a single two-week sprint. Splitting a 13 or 21 into two smaller vertical slices reduces carryover risk.

How do we run Planning Poker live with a remote squad?

Open the PollsLive Planning Poker template in Studio: teammates join by link with no account, tap their card on their phone or laptop while estimates stay hidden, and you reveal every vote together so nobody anchors on the first voice.

Ready to ask your audience?

Sign in free, build a poll in about a minute, share a QR or link, and watch the room answer live.

Usamos cookies esenciales para mantener tu sesión iniciada y evitar votos duplicados. Con tu permiso, también usamos Cloudflare Web Analytics para contar las visitas a las páginas y el Whop Pixel para ver qué visitas terminan en una compra. Política de cookies