Planning Poker & sprint capacity calculator
Overcommitting a sprint usually starts with ignoring holidays, ceremony overhead and review load. Enter your squad roster, PTO days, ceremony hours, focus factor and recent sprint velocities to calculate a realistic story-point commitment band. Then switch to the Consensus Analyzer to test Fibonacci, Modified Fibonacci, Powers-of-2 or T-shirt card spreads and spot when a backlog item needs splitting.
Net productive hours
235.2h
95% of zero-PTO squad baseline
Recommended commitment
31 pts
Scaled from 33 avg velocity
Safe floor / Stretch ceiling
26 - 35 pts
85% high-confidence to 110% stretch
Squad roster (5)
Squad roster and velocity settings stay in your browser local storage and are never sent to a server.
More free tools
Sprint retrospective format & prompt generator
Generate a complete sprint retrospective agenda in seconds: 8 proven formats (Start/Stop/Continue, 4Ls, Sailboat, DAKI, Rose/Bud/Thorn), tailored check-ins, timing and SMART action checker.
Workshop & presentation run-of-show planner
Build a timed run-of-show for workshops, webinars, lectures and all-hands. Audit passive monologue stretches, calculate clock timestamps, export CSV/Markdown, and run a full-screen stage timer.
Survey sample size & margin of error calculator
Calculate required survey sample size, minimum invites to send, and exact finite-population margin of error at 90%, 95% or 99% confidence. Audit whether a poll lead is real.
Veelgestelde vragen
How is net sprint capacity calculated?
For each team member, we subtract PTO and holiday days from the sprint length, multiply working days by daily hours and their availability percentage, subtract sprint ceremony hours (planning, daily standups, review and retrospective), and apply your focus factor (typically 65% to 75%) to account for code reviews, Slack, support and unplanned interrupts.
How does historical velocity turn hours into a story-point target?
Story points measure relative effort rather than raw hours, so the cleanest way to adjust for PTO is scaling your average historical velocity by this sprint's capacity ratio (net available person-days divided by a full-attendance baseline). We report a safe floor (85%), target (100%) and stretch ceiling (110%).
Why use Fibonacci numbers instead of 1-10 in Planning Poker?
Uncertainty grows faster than task size. The widening gaps in 1, 2, 3, 5, 8, 13, 21 stop a team wasting five minutes arguing between a 6 and a 7, and make a jump from 5 to 13 an unmistakable signal that hidden complexity or scope needs discussion.
When should a team split a story instead of accepting the estimate?
Most agile teams treat 13 points as a warning and 20 or 21 points as too large to fit reliably inside a single two-week sprint. Splitting a 13 or 21 into two smaller vertical slices reduces carryover risk.
How do we run Planning Poker live with a remote squad?
Open the PollsLive Planning Poker template in Studio: teammates join by link with no account, tap their card on their phone or laptop while estimates stay hidden, and you reveal every vote together so nobody anchors on the first voice.